This project for Irish Rail involved the installation of two lifts, stairs and pedestrian footbridges at both Gormanstown and Dalkey railway stations. The footbridges were enclosed with mesh panels on both sides and roof panels. For this project, The Forge Mechanical supplied, fabricated and fitted many areas of the steel including: Pedestrian footbridge steel/Railings steel/Handrails steel/Mesh side panels
Amazon
Project Description:
This project involved the fabrication and fitout of stairs for the Amazon office. The stairs was a feature to compliment the centre of a bright, open and modern office space. It can be viewed all the way down through the hub of the space from the top floor to the ground level. The project included 3 separate stairs linking the floors to one another, with each stairs custom made to fit the spaces and finished in the same colour. For this project, The Forge Mechanical supplied, fabricated and fitted: Feature metal stairs/Mesh stairs side panels/Stainless steel handrails.
WeWork
Project Description:
This project involved a feature staircase linking five levels within the We Work office space. During the fitout, some sections of the existing slabs were removed to allow for the intricate spiral design on the staircase. The circular staircase allowed access to each floor whilst retaining its beautifully fluid shape leading onto the next floor above and below it. For this project, The Forge Mechanical supplied, fabricated and fitted: Stairs steel/Railing steel/Handrail steel
The Curragh
Project Description:
This project was carried out during the of the refurbishment of The Curragh Racecourse. As part of the refurbishment, a new staircase was fitted in the main concourse area. For this project, The Forge Mechanical supplied, fabricated and fitted: Stairs steel/Railings steel
Dunnes Newbridge
Project Description:
The Dunnes Stores Newbridge redevelopment included new extensions to existing stores and refurbishment of various departments within the Dunnes store itself. The project was undertaken and completed as a live project, meaning there was live trading within the environment whilst the construction work was being carried out. For this project, The Forge Mechanical supplied, fabricated and fitted many areas including: Roof steel
Southern Cross
Project Description:
This residential development comprised of 160 residential units over four five-storey blocks with each block containing 40 units. For this project, The Forge Mechanical supplied, fabricated and fitted many areas of the steel including: Balconies steel/Railings steel
Sandyford
Project Description:
This project was a residential development in the heart of Dublin. It consisted of a total of 564 apartments spread over six blocks, each varying in height. For this project, The Forge Mechanical supplied, fabricated and fitted: Balconies steel/Railing steel/Handrail steel
Ardee Point
Project Description:
This project of residential development for students consisted of three blocks laid out around a central courtyard, each ranging between six to eight stories in height. It contains 368 bedrooms in a cluster style layout. For this project, The Forge Mechanical supplied, fabricated and fitted many areas of the steel including: Structural steel/ Railing steel/Glass balustrades
Established in 1916, The Forge Mechanical has extensive experience in the steel industry. Beginning its roots with shoeing horses and producing farm implements, the company has since evolved into becoming a key player within the structural steel industry.